Construction work in berth No.2 and 3 at Umm Qasr port

Construction of 10 tanks for storing raw edible oil of 4,000 tons each as well as ship unloader and truck loading station with all piping and pumps, complete rehabilitation of the structure of berth No2 and complete rehabilitation of berth No3 which is meant for all sugar importation.
See Also

The development and construction of berth No.11 and 11A at Umm Qasr port
Constructing more than 100,000 m2 of stacking yards utilizing for the first time in Umm Qasr port the use of interlock paving stone as bearing floor

Iraqi Container Terminal (ICT) at Umm Qasr port
Construction of interlock paved 150,000 m2 area for containers stacking.

The Containers terminal at berth No.8 in Khor Al-Zubair port
Construction of interlock paved 55,000 m2 area for containers stacking.